Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2843

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲特级aaaaaa毛片 | 91国内揄拍国内精品情侣对白 | 国产一区二区三区成人久久片 | 亚洲最大福利 | 欧美日本在线 | 日日碰夜夜 | 日韩 视频在线播放 | 免费视频一区二区三区四区 | 国产精品入口牛牛影视 | 人成午夜免费大片在线观看 | 亚洲激情在线观看 | 好男人社区神马www在线观看 | 9热这里只有真品 | 在线免费观看黄页 | 欧美黑人玩白人巨大极品 | 国产日韩一区二区三区在线观看 | 国产精品欧美一区二区 | 国产综合自拍 | 欧美成人另类 | 亚洲成人手机在线观看 | 国产精品盗摄一区二区在线 | 日韩欧美中文字幕在线播放 | 天美麻豆蜜桃91制片厂 | 欧美一级做一级爱a做片性 欧美一级做一a做片性视频 | 日本视频中文字幕一区二区 | 国产 欧美 日韩在线 | 一区二三区国产 | 99r在线播放| 四虎影院永久在线 | 男人网站在线亚洲影院 | 国产午夜精品理论片 | 精品在线播放视频 | 在线高清一级欧美精品 | 日本人乱人乱亲乱色视频观看 | 狠狠久| 91在线精品免费观看 | 婷婷中文网 | 欧美片网站yy | 91精品在线国产 | 日韩在线看免费高清完整版 | 欧美国产中文字幕 |