Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2605

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久综合丁香激情久久 | 国产亚洲人成网站在线观看不卡 | 99久视频 | 久久久国产一区二区三区 | 在线欧美日韩 | 禁网站在线观看免费视频 | 韩国资源视频一区二区三区 | 麻豆影视的经典视频 | 亚欧三级| 欧美午夜精品一区二区三区 | 99国产福利 | 精品一区二区三区高清免费观看 | 欧美在线一 | 日本成人一区二区三区 | 91久久青青草原线免费 | 精品四虎免费观看国产高清午夜 | 狠狠色丁香久久综合五月 | 欧美性乱视频 | japan在线观看| 羞羞网站在线观看 | 激情综合欧美 | 久久九九有精品国产56 | 日本不卡一区视频 | 日韩欧美精品有码在线观看 | avtt天堂网 手机资源 | 亚洲精品视频免费在线观看 | 日本在线视频播放 | 国产欧美日韩精品高清二区综合区 | 色婷婷亚洲综合五月 | 日本不卡视频一区二区 | www色日本 | 久久金8天国 | 久久精品福利 | 国产三级视频在线 | 久久六月丁香婷婷婷 | 欧美日韩一级视频 | 成人黄app福利网站大全 | 麻豆va亚洲va欧美va天堂 | 极品五月天 | 国产精品欧美一区二区 | 国产欧美日本在线 |