欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://www.ggscp.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2761

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费一级毛片在线视频观看 | 亚洲韩国日本欧美一区二区三区 | 欧美激情视频二区三区 | 国产高清一级毛片在线不卡 | aiai网站 | 韩国精品欧美一区二区三区 | 无遮挡羞羞视频 | h在线视频 | 一区二区在线看 | 国产日韩欧美 | 欧美午夜精品一区二区三区 | 开心激情五月婷婷 | 国产欧美日韩一区二区三区视频 | 成zzzwww日本免费 | 成人免费视频在线 | 一级片免费在线 | 欧美在线观看高清一二三区 | 国产一区二区三区夜色 | 亚洲综合婷婷 | 欧美地区一二三区 | 色婷婷综合和线在线 | 亚洲欧美日本在线观看 | 国产成人麻豆精品video | 成年人视频免费在线观看 | 久久久久国产精品免费 | 欧美福利社 | 国产三级精品久久三级国专区 | 亚色中文| 欧美黄色片在线 | 国产精品va一区二区三区 | 免费看动漫强人物动漫的 | 欧美男女网站 | 草莓香蕉绿巨人丝瓜榴莲18 | 999在线播放| 四虎最新永久免费网址 | 特黄特级毛片免费视 | 亚洲m男在线中文字幕 | 亚州三级| 欧美一区二区三区国产精品 | 欧美理论片手机在线观看片免费 | 精品在线观看国产 |