欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2962

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲欧美日韩综合在线播放 | 日本九九精品一区二区 | 日韩黄色在线视频 | 国内91视频 | 99视频都是精品热在线播放 | 日本综合欧美一区二区三区 | 农村寡妇一级毛片免费播放 | 国产国片精品jk制服 | 黄色在线视频播放 | 国内激情自拍 | 婷婷五月天.com | 69啪啪 | 成年人视频免费在线播放 | 日本视频在线免费观看 | 免费视频h | 亚欧三级| 欧美视频在线观 | 欧美日韩国产在线人成 | 一级毛片在线播放 | 年轻帅气小伙gay1069 | 男人社区天堂 | h在线视频 | 95老司机免费福利 | 动漫精品一区二区3d | 五月天堂婷婷 | 天天操精品视频 | 久久精品免费一区二区视 | 国产在线综合视频 | 恐怖片在线观看高清 | 欧美成人精品手机在线观看 | 污污的网站免费 | 国产激情在线观看 | 久久夜色精品国产噜噜小说 | 欧美成人午夜免费完成 | 中文字幕在线欧美 | 四虎免费影院在线播放 | 亚洲天堂久 | 精品国产一区二区三区不卡在线 | 999热这里全都是精品 | 免费日韩毛片 | 日韩新片在线观看 |