欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://www.ggscp.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3130

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费观看黄a一级视频 | 天天干天天操天天舔 | 日韩欧美综合视频 | 好吊色欧美一区二区三区四区 | 国产欧美一区二区 | 欧美色欧美亚洲另类 | 国产三级农村妇女做受 | 香蕉久久成人网 | 免费毛片播放 | 国产一级毛片高清视频在线 | 日韩精品午夜视频一区二区三区 | 亚洲欧美日韩综合精品网 | 久久只有精品 | 青青草国产免费国产是公开 | 国产日韩欧美自拍 | 99热成人精品热久久66 | 国产资源一区 | 91视频最新网址 | 91久久亚洲国产成人精品性色 | 中文字幕日本在线 | 台湾黄三级高清在线观看播放 | 亚洲精品动漫在线 | 亚洲欧美日韩中文综合v日本 | 亚洲第一成年网 | 国产特黄特色a级在线视 | 五月丁婷婷 | 国产精品va免费视频 | 日本人成动漫网站在线观看 | 久久婷婷丁香 | 91美女视频 | 老司机狠狠k免费毛片 | 欧美综合亚洲图片综合区 | 手机日韩看片 | 嫩草影院地址一地址二 | 久久香蕉国产线看观看网站 | 朋友的妻子在线播放 | 黄色视屏免费在线观看 | 精品在线一区 | 黄工厂精品视频在线观看 | 国产精品99久久久久久董美香 | 欧美日本二区 |