欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3550

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 久久久国产精品视频 | 亚洲成年网站在线观看 | 两个人免费完整高清视频中国 | 国产精品妖精视频 | 成年女人毛片免费观看中文w | 色综合视频 | 日韩欧一级毛片在线播无遮挡 | 成在线人永久免费播放视频 | 91精品久久久久久久99蜜桃 | 69国产成人精品午夜福中文 | 91色在线播放 | 亚洲精品一二三四 | 啦啦啦www在线观看播放高清 | 亚洲欧美日韩第一页 | 亚洲日本综合 | 玖玖在线国产精品 | xx视频在线永久免费观看 | 青青在线观看 | 欧美三级视频在线 | 国产成人综合亚洲欧美在 | 在线观看99 | 欧美日韩免费一区二区在线观看 | 91精品国产免费自在线观看 | 国产精品边做边接电话在线观看 | 成人黄色片网站 | 手机在线播放视频 | 高清亚洲 | 特黄特黄 | 经典三级四虎在线观看 | 久久窝窝国产精品午夜看15 | 四虎永久影院永久影库 | 四虎影视站长工具 | 日本不卡视频在线 | 高清一区二区亚洲欧美日韩 | a级国产乱理伦 | 欧美又大粗又爽又黄大片视频黑人 | 亚洲人成亚洲精品 | 星空影院手机免费观看下载 | 黄色片aaaa | 蘑菇香蕉茄子绿巨人丝瓜草莓 | 西西人体www |