Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4214

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 四虎最新网址入口 | 在线免费看片a | 四虎在线视频免费观看 | 亚洲国产经典 | 欧美成人一区二区 | 婷婷sese| 欧美韩国日本在线 | 国产真实乱了在线播放 | 亚洲成年 | 人人爰人人人人人鲁 | 国产日韩精品欧美一区色 | 午夜黄色小视频 | 久久国产一区二区三区 | 这里只有久久精品 | 久久精品高清视频 | 色综久久天天综合绕视看 | 伦理不卡 | 亚洲国产一成人久久精品 | 欧美特级一级片 | 岛国精品在线观看 | 青青草原影视 | 日韩在线视频一区二区三区 | 成人精品综合免费视频 | 成人午夜在线观看国产 | 99久久综合国产精品免费 | 岛国大片在线观看 | 国产成人午夜91精品麻豆剧场 | 激情影院成人区免费观看视频 | 成年大片免费视频播放手机不卡 | 日本不卡在线视频高清免费 | 日韩黄色一级视频 | 美女一级毛片免费不卡视频 | 国产福利一区二区在线观看 | 九色在线观看 | 国产老女人精品免费视频 | 四虎在线视频免费观看视频 | 韩国免费一级成人毛片 | 影音先锋色先锋女同另类 | 国产麻豆a一级毛片爽爽影院 | 日本精品一区二区三区在线观看 | 久久精品第一页 |