Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4962

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本不卡一区二区三区在线观看 | 在线日韩欧美一区二区三区 | 三面娜迦免费观看 | 欧美视频免费看 | 中文字幕第15页 | 2021色噜噜狠狠综曰曰曰 | 亚洲一区免费在线 | 星武神诀在线观看全集免费播放 | 热九九精品 | 日本在线免费观看 | 日韩国产第一页 | 一区二区三区视频观看 | 国产精品素人搭讪在线播放 | 欧美午夜精品久久久久免费视 | 91久久青青青国产免费 | 成年女人18级毛片毛片免费观看 | 午夜羞羞影院体验区60秒 | 精品推荐国产麻豆剧传媒 | 亚洲六月丁香色婷婷综合久久 | 美女网站色在线观看 | 国产在线原创剧情麻豆 | 国产精品日韩欧美亚洲另类 | 色樱桃影院亚洲精品影院 | 四虎影视8848a四虎在线播放 | 在线综合视频 | 国产精品动漫网站 | 国产野花视频天堂视频免费 | 欧洲在线免费视频 | 大蕉久久伊人中文字幕 | 在线观看香蕉免费啪在线观看 | 亚洲区一区| 青草国内精品视频在线观看 | 亚洲毛片在线免费观看 | 国产高颜值露脸在线观看 | 91精品久久国产青草 | 欧美一区二区三区免费不卡 | 91香蕉视频在线播放 | 少妇高潮太爽了在线视频 | 久久99热66这里只有精品一 | 大伊香蕉精品视频在线观看 | 日韩精品一区二区三区在线观看l |