Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5164

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 五月天第一页 | 日本中文字幕视频在线看 | 四虎comwww最新地址 | 亚洲欧美日韩一级特黄在线 | 极品在线 | 久久精品女人毛片国产 | 国产精品网红女主播久久久 | 欧美日韩一区二区三区免费不卡 | 国产91激情对白露脸全程 | 国产欧美日韩在线观看 | 亚洲欧洲精品成人久久曰 | 五月天桃花网 | 欧美日韩在线观看区一二 | 欧美日韩一区在线观看 | 亚洲国产高清一区二区三区 | 黄色毛片在线 | 国产福利小视频在线播放观看 | 四虎网站最新网址 | 97免费视频免费视频 | 久久综合精品不卡一区二区 | 国产一区二区三区欧美精品 | 色偷偷www8888 | 一级片免费网址 | 国产日本一区二区三区 | 免费的高清影视网站 | 国产ppp在线视频在线观看 | 国产日韩欧美在线一区二区三区 | 99久热这里只有精品免费 | 免费黄址 | 四虎sihu新版影院亚洲精品 | 亚洲经典一区 | 欧美成人精品一区二区三区 | 五月天精品视频播放在线观看 | 那个在线播放观看 | 亚洲一区日韩二区欧美三区 | 国产精品亚洲综合天堂夜夜 | 精品免费视在线观看 | 国产成人宗合 | 美女网站视频色 | 青青青视频在线播放视频 | 欧美日韩国产高清一区二区三区 |