Foshan main steel members (b)

Time:[2016-5-14]  Hits:5492

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲大黑香蕉在线观看75 | 色综合天天综合给合国产 | 三级视频在线播放线观看 | 国产一级三级三级在线视 | 香蕉视频在线免费 | 精品国产高清久久久久久小说 | 丁香六月久久 | 四虎永久免费地址在线网站 | 国内外成人免费在线视频 | 丝袜高跟美脚国产1区 | 欧美啄木乌成人系列影片bt种子 | 国内外成人在线视频 | 天堂网视频在线观看 | 欧美另类日韩 | 视频一区二区三区在线 | 清纯唯美亚洲综合欧美色 | 日韩欧美亚洲乱码中文字幕 | 亚洲四虎影院 | 成人免费高清视频 | 日本一二区在线观看 | 777黄色| 四虎在线影视 | h成人动漫 | 午夜一级成人 | 欧美视频免费在线观看 | 五月天爱爱 | 国产精品国产亚洲精品看不卡 | 1024在线观看国产天堂 | 精品国产香蕉在线播出 | 天堂新版资源中文最新版下载地址 | 三级网站视频 | 天天操夜夜操美女 | 亚洲成在人线综合导航下载 | 色婷婷精品免费视频 | 一级片免费在线观看 | 久热久 | 欧美天天干 | 欧美精品三区 | 91视频下载网址 | 久久精品国产福利国产秒 | www.精品 |