Foshan main steel members (b)

Time:[2016-5-14]  Hits:5283

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 国产在线原创剧情麻豆 | 国产九九在线观看播放 | 高清国产在线 | 国产一区二区三区久久精品 | 不卡在线一区 | 四虎4h| 麻豆国产精品高中生视频 | 日本私人网站在线观看 | 国产亚洲人成网站在线观看不卡 | 中文字幕在线观看亚洲日韩 | 日韩在线不卡视频 | 亚洲天堂999| 青青操原| 国产欧美大片 | 久久com| 成年女人毛片免费观看中文w | 老子不卡 | 免费女人18a级毛片视频 | 天堂在线看 | 色婷婷香蕉 | 视频一区二区中文字幕 | 99久久精品国产国产毛片 | 亚洲天堂视频一区 | 精品一区二区久久 | 欧美精品一二三区 | 九九热爱视频精品视频高清 | 国产天堂| 91av片| 四虎成人免费观看在线网址 | 成人黄色毛片 | 99re6在线视频精品免费 | 赌侠1999 | 国产99视频精品免费视频免里 | 成人久久影院 | 中文字幕成人 | h肉动漫无遮挡在线观看免费 | 国产永久在线视频 | 免费女人18a级毛片视频 | 久久最新视频 | 成人免费一区二区三区 | 草久久久 |