Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4758

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 黄网站色成年片在线观看 | 国产va在线观看 | 亚洲欧美一区二区久久香蕉 | 综合色区 | 特黄日韩免费一区二区三区 | 黑人黄色毛片 | 国产免费啪视频观看网站 | 全高清特级毛片 | 成人免费黄色片 | 久久久久久久久久免观看 | 视频一区二区在线播放 | 在线观看精品视频网站www | 日韩第1页 | 国产精品自拍视频 | 免费看动漫网站 | 亚洲精品在线视频观看 | 免费看一级a一片毛片 | 亚洲狠狠婷婷综合久久久图片 | 在线免费观看精品 | 妈妈的朋友伦理在线观看 | 国产毛片a | 国产拍在线| 在线视频日本 | 亚洲精品二区 | 四虎永久精品免费观看 | 特级毛片在线观看 | 91视频免费视频 | 久久99爱re热视 | 国产成人毛片毛片久久网 | 韩国黄色网页 | 日韩亚洲欧美视频 | 天堂最新版免费观看 | 天天摸天天 | 久久精品福利视频 | 一本大道香蕉高清视频在线 | 精品精品国产高清a毛片牛牛 | 亚洲swag精品自拍一区 | 天美麻豆国产传媒免费视频 | 免费视频久久 | 黄网站在线免费 | 国产传媒一区二区三区呀 |