raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4907

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美人与动人物xxxx | 国产精品操| 性视频网站在线 | 亚洲天堂2013 | 四虎免费观看 | 欧洲一卡2卡三卡4卡免费网站 | 国产自线一二三四2021 | 最近中文字幕2018动漫 | 青草视频入口 在线观看 | 日本一区二区三区四区不卡 | 搞鸡app下载| 亚洲青青青网伊人精品 | 亚洲国产一 | 国产精品入口麻豆高清在线 | 99er在线视频| 四虎永久在线精品网址 | 国产欧美日韩精品专区 | 国产香蕉一区二区在线观看 | 久久精品国产免费看久久精品 | 久久精品国产91久久麻豆自制 | 91www永久在线精品果冻传媒 | 99久久精品费精品国产一区二 | 亚洲专区视频 | www国产精品com | 一级毛片一级片 | 日韩操穴| 久久久久久久久久久久久久久久久 | 欧美一区二区三区不卡 | 日韩国产欧美视频 | 免费观看国产精品视频 | 国产精品国产三级国产专区5o | 九九热精品免费观看 | 97免费在线观看视频 | 无限免费动漫看片的 | 女人l8毛片a级18女人水真多 | 国产精品国产欧美综合一区 | 中国美女大战黑人国产 | 成人一级黄色大片 | 成人精品一区二区三区校园激情 | 欧美日韩不卡码一区二区三区 | 亚洲成人网在线观看 |