raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5115

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国内精品在线观看视频 | 欧美国产三级 | 一级毛片视频在线 | 国产精品1区 | 成在线人免费视频一区二区三区 | 91在线中文 | 国产精品一区二区三区四区五区 | 国内精品久久久久久久久久影视 | 欧美人与动性行为高清视频 | 日本快播 | 91入口| 特黄aaaaaa久久片 | 亚洲 欧美 日韩 在线 香蕉 | 青青在线视频 | 一本久久精品一区二区 | 精品中文字幕一区在线 | 点击进入不卡毛片免费观看 | 精品国内一区二区三区免费视频 | 岛国视频在线观看免费播放 | 四虎影院新网址 | 啄木乌欧美一区二区三区 | 高清国产亚洲va精品 | 国产好片无限资源 | 亚洲日韩精品欧美一区二区 | 国产极品在线观看视频 | 久操久操久操 | 亚洲另类网 | 成人在线第一页 | 精品99视频 | 午夜羞羞视频在线观看 | 亭亭色 | 超清国产粉嫩456在线免播放 | 亚洲第一区精品日韩在线播放 | 91免费永久国产在线观看 | 911精品国产91久久久久 | 久久久毛片免费全部播放 | 亚洲偷自| 人间正道是沧桑全集免费下载高清 | 一级片在线观看视频 | 亚洲黄色片免费看 | 欧美亚洲视频 |