1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5082

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线免费一级片 | 四虎永久在线精品国产 | 狠狠色丁香婷婷综合激情 | 亚洲国产一区二区三区在线观看 | 日韩免费一区二区三区在线 | 国产91免费视频 | 国产啪精品视频网给免丝袜 | 久久精品国产99久久72 | 1204你懂的国产国片免费 | 久久久青青 | 欧美精彩视频在线观看 | 99re在线这里只有精品免费 | 亚洲精品午夜国产va久久 | 日日射日日操 | 男女一边摸一边做羞羞视频免费 | 综合色好色 | 亚洲噜噜噜噜噜影院在线播放 | 免费人成网站 | 国产精品国产三级国产an不卡 | 一级特级女人18毛片免费视频 | 亚洲欧美一区二区三区麻豆 | 色婷婷精品 | 国产精品俺来也在线观看了 | 国产午夜爽爽窝窝在线观看 | 麻豆精品在线播放 | 亚洲国产美女精品久久久久 | 中文岛国精品亚洲一区 | 国产三级在线观看完整版 | 直接进入免费看黄的网站 | 中文字幕第一页在线 | 国产精品视频免费视频 | 国产永久免费爽视频在线 | 欧美成人久久一级c片免费 欧美成人久久久免费播放 欧美成人精品在线 | 四虎最新免费观看网址 | 香蕉尹人 | 欧美成人免费一区在线播放 | 黄色日b视频 | 2022国内精品免费福利视频 | 2019天天做天天拍天天夜 | 国产五月婷婷 | 美国色综合 |