1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4984

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产亚洲欧美一区二区三区 | 四虎影院最新网址 | 91最新在线视频 | 欧洲一区二区 | 69黄色| 色婷婷亚洲十月十月色天 | 色综合在| 久久国产精品麻豆映画 | 亚洲欧美在线观看一区二区 | 亚洲激情综合在线 | 卡通动漫亚洲综合 | 亚洲日韩第一页 | 日本aaa大片| 国产一区二区三区免费播放 | 手机看片一区 | 午夜爽爽影院 | 日韩久久一区二区三区 | 国产天天色 | 亚洲欧美视频一区二区 | 成人黄视频在线观看 | 成人中文网 | 四虎网站在线播放 | 久久国内免费视频 | 最新日本免费一区二区三区中文 | 成人网在线视频 | 国产福利在线免费观看 | 国产麻豆剧传媒精品好看的片 | a级亚洲片精品久久久久久久 | 欧美成人性色生活片免费在线观看 | 亚洲精品在线影院 | 国产1024精品视频专区免费 | 四虎在线看 | 久久精品国产一区二区三区不卡 | 国产91高清在线 | 国产午夜亚洲精品 | 亚洲欧洲一二三区 | 一区二区在线欧美日韩中文 | 91在线色 | 97青青 | 麻豆91免费视频 | 精品久久一区二区三区 |