欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Engineering Technology: General requirements for inspection of steel structure engineering foundation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://www.ggscp.cn

Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4627

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 五月欧美激激激综合网色播 | 丁香六月啪啪 | 亚洲最新网址 | 最新亚洲精品国自产在线 | 欧美一区二区三区久久久 | 狠狠热精品免费观看 | 久热re在线视频精品免费 | 国产最新在线视频 | 99re只有精品 | 亚洲精品亚洲人成在线麻豆 | 成人羞羞视频在线 | 99re在线精品 | 国产黄色影视 | 日本不卡在线视频 | 黄色免费在线观看网站 | 国产a视频精品免费观看 | 精品一区二区免费视频 | 99久久精品免费看国产情侣 | 免费看黄视频网站 | 中文精品久久久久国产网址 | 四虎成人免费影院网址 | 99精品一区二区三区 | 亚洲视频一区在线 | 欧美人与动交tv | 亚洲综合成人在线 | 亚洲最大的成网4438 | 国产一级毛片视频 | 996久久国产精品线观看 | h在线看免费视频网站男男 h在线看 | 亚洲2020天天堂在线观看 | 国产精品va在线观看一 | 久久99精品久久久久久秒播放器 | 性做久久久久久久免费看 | 欧美国产成人一区二区三区 | 日韩一级影院 | 曰本亚洲欧洲色a在线 | 国产精品自在线拍 | 四虎影视国产精品一区二区 | a爱爱视频 | 久久久久久国产精品mv | 日韩国产欧美在线观看 |