Steel works construction schedule control content

Time:[2014-11-15]  Hits:5679

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲国产成人精品91久久久 | 久久久久激情免费观看 | 成人a区| 亚洲第一免费播放区 | 免费观看黄色视屏 | 欧美另类杂交a | 日韩手机在线观看 | 国产一卡2卡3卡4卡公司在线 | 尤物国产在线精品福利一区 | 日韩精品欧美在线 | 国产福利91精品一区二区三区 | 日韩欧美视频一区二区三区 | 精品国产高清不卡毛片 | 国产一进一出视频网站 | 亚洲免费视频在线观看 | 一级一片一a一片 | 日韩3级| 久久com| 成人午夜看片在线观看 | 亚洲欧洲国产成人精品 | 久久久久久综合对白国产 | 日本最新新片在线观看免费 | 狠狠色综合久久久久尤物 | 四虎在线视频免费观看 | 韩国美女一级片 | 欧美精品免费在线观看 | 青青伊人网 | 在线观看亚洲网站 | 啊用力点国产嗯快在线观看 | 99热这里有免费国产精品 | 美女国产在线观看免费观看 | 两个人的免费视频 | 狠狠88综合久久久久综合网 | 国产精品中文字幕在线观看 | 蜜柚视频网在线观看免费版 | 亚洲精品网站在线观看不卡无广告 | 日韩国产午夜一区二区三区 | 日日摸摸| 麻豆蜜桃| 国产精品所毛片视频 | 久草成人在线视频 |