欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5434

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 大陆国语自产精品视频在 | 精品国产第一国产综合精品 | 日本特黄的免费大片视频 | 日产乱码卡1卡2卡三卡四在线 | 久久青青热 | 欧洲欧美人成在线视频免费下载 | 成年人黄色免费网站 | 高h在线播放 | av免费网站在线观看 | 五月婷婷狠狠干 | 男人天堂亚洲 | 国产精品入口免费视频 | 在线观看免费精品国产 | 日本人爽p大片免费看 | 成人爱情动作片 | 99久久精品国产片 | 日本亚洲最大的色成网站www | 国产精选91热在线观看 | 99re这里有免费视频精品 | 免费高清视频日本 | 一级毛片免费一级直接观看 | 久久黄色视屏 | 9久热久爱免费精品视频在线观看 | 国产视频黄 | 99久久精品国产麻豆 | 在线视频 日韩 | 美女隐私下部无遮挡免费视频 | 亚洲精品不卡久久久久久 | 日本久久久久 | 欧美一区亚洲 | 手机看片国产在线 | 成年女人午夜毛片免费看 | 日韩免费在线视频观看 | 在线观看香蕉免费啪在线观看 | 手机在线观看国产精选免费 | 麻豆成人久久精品二区三 | 韩日精品视频 | 亚洲黄视频在线观看 | 欧美成人亚洲 | 亚洲一区二区三区免费视频 | 亚洲线精品一区二区三区 |