欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Control of welding process elements in steel structure design engineering
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:2044

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91精品成人免费国产片 | 亚洲四色 | 色婷婷91 | 在线视频亚洲一区 | 四虎影视精品 | 操一操干一干 | 国产精品免费视频一区二区三区 | 特级a毛片| 麻豆国产精品免费视频 | 91在线播| 天天插一插 | 在线国产中文字幕 | 国产中文欧美 | 欧洲成人免费高清视频 | 一区二区三区日韩 | 黑人一级大毛片 | 麻豆成人久久精品二区三 | 亚洲一区二区三区精品国产 | 国内精品久久久久不卡 | 成人免费看视频 | 四虎影视亚洲精品 | 高清亚洲综合色成在线播放放 | 亚洲大黑香蕉在线观看75 | 亚洲天堂精品视频 | 欧美亚洲天堂 | 1024手机看片国产旧版你懂的 | 亚洲一区免费在线观看 | 四虎成人在线 | 91麻豆国产免费观看 | 国产精品久热 | 麻豆理论片 | 婷婷自拍| 女人18毛片a级毛片一区②区 | 国产成人三级视频在线观看播放 | 91手机视频在线观看 | 亚洲欧美国产中文 | 狠狠狠色丁香婷婷综合久久俺 | 两个人在线观看完整 | 激情视频在线观看免费 | 中文字幕一区二区三区免费看 | 91在线播放网站 |