欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Main reinforcement construction methods of steel workshop building reinforcement
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2728

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲日本中文字幕永久 | 免费看黄的视频网站 | 日本免费人成黄页在线观看视频 | 欧日韩不卡在线视频 | 最近中文字幕完先锋资源 | 色99视频| 久久久久久国产精品免费免费 | 青青青青久久久久国产的 | 成人看片在线观看免费 | 九一在线 | 精品久久久久久久 | 男女羞羞的视频网站在线观看 | 青青草精品在线 | 日本不卡在线视频 | 日本黄在线观看免费播放 | 日本欧美中文 | 91麻豆网| 天堂素人约啪 | 2级毛片| 四虎影在永久地址在线观看 | 日本综合色| 久久精品福利 | 91婷婷色| 婷婷久久综合九色综合绿巨人 | 国产极品美女在线观看 | 四虎国产永久免费久久 | 毛片视频免费观看 | 久久曰视频 | 久久精品国产精品亚洲20 | 麻豆一区 | 两个人的视频免费 | 456亚洲人成影视在线观看 | 欧美亚洲另类久久综合 | 天美麻豆国产传媒免费视频 | 91av在线免费观看 | 岛国片在线观看 | 亚洲婷婷综合网 | 国产一级视频播放 | 久久久久国产精品四虎 | 日产精品卡2卡三卡乱码网址 | 片成年免费观看网站黄 |